Home > CityNews > New Drainage Pipeline Construction > Fixing Services in Dubai

New Drainage Pipeline Construction / Fixing Services in Dubai

Added: (Mon Jul 10 2017)

Pressbox (Press Release) - When designing drainage pipelines, the design must be extended to cross any road or proposed road widening that's adjacent to the development. This ensures any existing or proposed services within the road reserves are known and the proposed drainage works can cross these services.

Construction and maintenance requirements are particularly important considerations when designing channel or waterway works. Relevant considerations include:

- the maximum slope and height of the grassed batters
- whether trucks require access to the channel invert
the location of inlets and roads
- whether there are limitations on the use of certain construction
ground conditions
- the distance from the proposed alignment to any existing services (particularly - if there are any issues with side loading effects during excavation)

Submitted by:rajuudubai
Disclaimer: Pressbox disclaims any inaccuracies in the content contained in these releases. If you would like a release removed please send an email to remove@pressbox.co.uk together with the url of the release.